Building a Custom House in Coquitlam: Permits, Warranty and Who Can Build

Some buyers want a house that nobody else has chosen: their own plan, on their own lot. In Coquitlam that means one of two paths. A licensed residential builder builds it, or the owner builds it under an owner builder authorization from BC Housing. Each path has its own rules, the City asks for the same documents at the permit stage either way, and a buyer living outside Canada has three questions to answer before the plan.
Two ways to build
| Licensed residential builder | Owner builder | |
|---|---|---|
| Who builds | A builder licensed by BC Housing | The owner, building or directly managing the work personally |
| Home warranty insurance | Required on every new home the builder builds | Not required; the owner builder is responsible for defects for 10 years |
| Before construction | The builder arranges home warranty insurance | The owner gets an owner builder authorization, after an exam |
| Selling soon after | No owner builder limits | No sale during construction or within one year of occupancy without permission |
BC Housing's page on home warranty insurance says all new homes built by a licensed residential builder must have home warranty insurance, covering defects in materials and labour for 2 years, the building envelope for 5 years and the structure for 10 years.
The owner builder path
BC Housing's Regulatory Bulletin No. 4, revised in September 2018, lists the criteria for an owner builder authorization. You must:
- be an individual, with a registered interest in the land such as fee simple ownership;
- intend to build a single dwelling unit, such as a detached house;
- not offer to sell, sell or transfer your interest during construction or for at least one year after the home is built;
- intend to use the home yourself for at least one year after first occupancy;
- build, or directly manage the construction of, all or nearly all of the home;
- pass the owner builder exam with 70% or more, and pay the $425 fee, of which $50 is not refundable.
The bulletin is direct about the main limit. If an owner builder hires a builder, construction manager, project manager or other third party to manage the build, both sides commit offences and could face penalties of up to $25,000 or prosecution.
Once approved, the owner builder receives a sealed New Home Registration Form and takes it to the City to get a building permit. When the house is finished and occupied, the owner builder reports the occupancy date and the trades used. The occupancy permit date starts the 10 year defect liability, the one year personal use requirement and the waiting period for any future authorization.
Selling an owner-built house
BC Housing's page on buying or selling an owner-built home says owner builders cannot offer to sell or sell a home that is under construction or within one year after occupancy, unless BC Housing grants permission because of undue hardship, with a $100 processing fee. Within 10 years of occupancy, a seller must give each prospective buyer an Owner Builder Disclosure Notice before entering into a contract.
For a buyer looking at a new house on the Coquitlam new homes page, this is the reason to check every address in BC Housing's New Homes Registry. An owner-built house can look the same as a builder's house and carry different protection.
What the City asks for
The City of Coquitlam's building permit checklist for single family and two family dwellings says incomplete applications will not be accepted. The documents required at application include:
- the application form, and an agent authorization form if someone applies for you;
- the application fee;
- a current title search, with copies of restrictive covenants, easements and rights of way;
- any approvals and reports that apply, such as a geotechnical report;
- a BC Housing form;
- two sets of architectural and structural drawings for a single family house;
- a certified topographical survey plan, sealed and signed.
The drawings must show a site plan with the driveway location, width and slope, off-street parking including any suite parking, easements and watercourses, and the sewer connections. The checklist adds that buildings built before 1990 may need hazardous materials testing before a permit is issued, a step to plan for when an older house is being replaced. The City's zoning rules for up to four homes on a lot decide what can go on the lot in the first place.
If you live outside Canada
Three questions come before the plan.
Can you buy the lot? The federal ban covers residential property until 1 January 2027. Its regulations say that acquiring residential property for the purposes of development is not a purchase, but they do not define development. Ask a BC lawyer how this applies to your lot and plan before you sign.
Can you be the owner builder? The authorization needs personal use of the home for a year and personal management of the build. A buyer living abroad who will not move in or run the site does not fit those criteria, so a licensed residential builder is the path that fits.
What will you pay? BC's 20% additional property transfer tax applies to a foreign national buying residential property in Metro Vancouver, and the yearly vacancy tax applies to a foreign owner unless an exemption applies. The foreign buyer guide works through both.
Next steps
Before you buy a lot, confirm what the zoning allows, what the build will cost with a licensed builder, and how long the City's permit review takes for that address. Michael can help you compare a lot and a build with the new houses already for sale. Contact Michael with an address.
Frequently asked questions
Who can build a custom house in Coquitlam?
A licensed residential builder, or the owner under an owner builder authorization from BC Housing. BC Housing says all new homes built by a licensed residential builder must have home warranty insurance. An owner builder needs the authorization before construction starts, must pass an exam with 70% or more, and must build or directly manage the construction personally.
Can an owner builder hire a general contractor to build the house?
No. BC Housing's Regulatory Bulletin No. 4 says owner builders must build or directly manage the construction themselves. If an owner builder engages a builder, construction manager, project manager or other third party to do that, both sides commit offences under the Homeowner Protection Act and could face penalties of up to $25,000 or prosecution. Tradespeople can still be hired for parts of the work.
What does an owner builder authorization require?
BC Housing's bulletin lists the criteria. You must be an individual with a registered interest in the land, build a single dwelling unit, not sell or transfer the land during construction or for at least one year after the home is built, intend to use it yourself for at least a year, pass the exam with 70% or more, and pay the $425 fee.
Can an owner builder sell the house right after it is finished?
Not within the first year. BC Housing says owner builders cannot offer to sell or sell an owner-built home that is under construction or within one year after occupancy, unless BC Housing grants permission because of undue hardship, which costs a $100 processing fee. Within 10 years of occupancy, the seller must give buyers an Owner Builder Disclosure Notice.
What does Coquitlam ask for with a house building permit application?
The City's checklist for single family and two family building permits lists an application form, the fee, a current title search with copies of covenants, easements and rights of way, a BC Housing form, any approvals and reports such as a geotechnical report, two sets of drawings for a single family house, and a sealed certified topographical survey plan.
Why does Coquitlam ask for a BC Housing form with a permit?
The City's building permit checklist lists a BC Housing form among the documents required at application. BC Housing's owner builder bulletin says an approved owner builder receives a sealed New Home Registration Form and takes it to the municipality to get a building permit. Ask the City which form applies to your project before you apply.
Does a custom house built by its owner have a warranty?
Only if the owner builder chose to buy one. BC Housing's bulletin says owner builders are not required to arrange third-party home warranty insurance, and an owner builder without a policy is responsible for construction defects for 10 years, with protection set by section 23 of the Homeowner Protection Act: 2 years for materials and labour, 5 years for the building envelope and 10 years for structure.
Can a buyer living outside Canada become an owner builder?
The authorization requires an intention to use the home personally for at least one year after first occupancy, and personal management of the construction. A buyer who lives abroad and will not move in or run the build does not fit those criteria. Such a buyer can hire a licensed residential builder instead. The federal ban on non-Canadians must also be checked first.
Sources
- City of Coquitlam, Residential Single Family / Two Family Building Permit Checklist (accessed November 9, 2026)
- BC Housing, Regulatory Bulletin No. 4, Information for Owner Builders (revised September 2018, accessed November 9, 2026)
- BC Housing, Buying or Selling an Owner-Built Home (content current as of September 22, 2026, accessed November 9, 2026)
- BC Housing, Home warranty insurance for new homes (content current as of September 22, 2026, accessed November 9, 2026)